by Asher Snyder | Jan 2, 2025 |
Vivos is a integrative health practice focused on breathing wellness. Their office tenant improvement project upgraded a Class A suite with LED lighting, beautiful curved soffits, new training rooms, and showcased elegant finishes throughout.
Vivos Highlands Ranch, CO
Medical / Dental Office Tenant Improvement
Snyder Building completed the 3,200-square-foot build-out of the gym space, lobby, restrooms, and utility closet for the new location at Orchard Park Place in Westminster, CO. The left side of the gym includes metal I-beam support for the water bags used in the boxing routines and the right side of the gym is outfitted with weight benches and free weights for resistance training.
The client opted for a concealed or hidden structural steel rack for the boxing bags. Sound dampening was a main concern for the adjacent tenants, so a rubber flooring system was installed throughout the space. Acoustical sealant was applied at the top of the walls and an isolation pad was installed at the bottom of the walls to minimize vibrations and sound. The walls were built with a double layer of sheetrock with one being Quiet Rock to provide extra sound protection. An A/V system was installed to provide specialty lighting including black lighting and music throughout.
by Asher Snyder | Dec 31, 2024 |
Centennial Medical Center
We’re committed to providing safe and clean job sites for all of our clients. With health and safety at the forefront for physicians and medical staff, our commitment is even more resolute with our medical office buildings.
Centennial Medical Center
Multi-phased, Occupied Tenant Improvement / Medical Office Building
Davis Partnership Architects
We’re committed to providing safe and clean job sites for all of our clients. With health and safety at the forefront for physicians and medical staff, our commitment is even more resolute with our medical office buildings. The 14000 and 14001 medical buildings on East Arapahoe were 15,700 sf of multi-phased, occupied renovation. We renovated the main corridors and elevator lobbies of each wing and floor, including the replacement of carpet and LVT flooring, and interior wall finishes, as well as fully upgraded restrooms, hallway ceilings and common corridor light fixtures.
by Asher Snyder | Dec 31, 2024 |
THRIVE is a national veterinary clinic associated with PetCo. Their first standalone retail location in Denver is now open in the Uptown neighborhood. We worked alongside Fox Architecture to transform a former 1,500 square-foot restaurant into THRIVE’s signature vet clinic.
THRIVE Affordable Pet Care
Commercial Tenant Improvement / Laboratory / Veterinary Clinic / Retail Construction
Snyder Building completed the 3,200-square-foot build-out of the gym space, lobby, restrooms, and utility closet for the new location at Orchard Park Place in Westminster, CO. The left side of the gym includes metal I-beam support for the water bags used in the boxing routines and the right side of the gym is outfitted with weight benches and free weights for resistance training.
The client opted for a concealed or hidden structural steel rack for the boxing bags. Sound dampening was a main concern for the adjacent tenants, so a rubber flooring system was installed throughout the space. Acoustical sealant was applied at the top of the walls and an isolation pad was installed at the bottom of the walls to minimize vibrations and sound. The walls were built with a double layer of sheetrock with one being Quiet Rock to provide extra sound protection. An A/V system was installed to provide specialty lighting including black lighting and music throughout.
by Asher Snyder | Dec 23, 2024 |
The new, 15,000 sq.ft. Vivos Institute training center in Denver, Colorado, was completed in August 2021 to expand capacity for Vivos’ training and corporate office needs.
Medical | Dental Tenant Improvement
The company provides advanced post-graduate education to dentists, dental teams, and other healthcare professionals in a live and hands-on setting to learn more about obstructive sleep apnea (OSA).
The tenant improvement project, designed by Ely Architecture, is situated within a larger multi-tenant, office complex. The project scope included construction of a new 4,000 square-foot presentation room, new commercial kitchen, exam rooms, sterilization zone, breakroom facilities, and upgraded finishes.
Recent Comments