720-900-5082

CDPHE Tuberculosis Lab

CDPHE TB Lab

This project for CDPHE involved sterilizing the existing tuberculosis lab before installing new infrastructure and making architectural modifications to accommodate a new autoclave.

Client

Colorado Department of Health & Environment

Project Type

Science / Critical Facilities, Government / Municipality

Architect

RMH Group Engineering + Design

About The Project

This project for CDPHE involved sterilizing the existing tuberculosis lab before installing new infrastructure and making architectural modifications to accommodate a new autoclave. Along with the necessary MEP upgrades, the project included millwork and other architectural finishes tailored to the lab environment. Careful attention was given to ensure that the work was completed without impacting other CDPHE activities outside the lab.

Intelsat 10M Antenna A27

Intelsat 10M Antenna A27

The Intelsat 10M Antenna 27 project involved several site drainage improvements, as well as a complex structural pad and electrical/communications scope.

Client

Intelsat 10M Antenna A27

Project Type

Science / Critical Facilities

Architect

Archcentric, PC

About The Project

The Intelsat 10M Antenna 27 project involved several site drainage improvements, as well as a complex structural pad and electrical / communications scope. This new antenna was added to an existing antenna farm, requiring close communication with the client and coordination with existing underground infrastructure to prevent any disruptions or outages to ongoing operations. The antenna pad is 4 feet thick, placed over 8 inches of void form, and supported by five caissons. A key challenge in constructing the 10M dish pad was setting the 8-foot template of 24 bolts, each 4 feet long and 1-1/8 inches thick, in precise alignment with true north and ensuring they were perfectly plumb. Seventeen 2”-4” conduits were installed to interconnect the antenna with the communications building and on-pad controls.

satellite construction

3D Systems – Metal Printing Lab

3D Systems – Metal Printing Lab

3D Systems is on the forefront of innovation—the company works to get products to market faster by leveraging 3D printing and prototyping.

Client

3D Systems​

Project Type

Science / Critical Facilities, Industrial

Architect

Jigsaw Design, LLC

About The Project

3D Systems is on the forefront of innovation—the company works to get products to market faster by leveraging 3D printing and prototyping. As work volume increased at their Littleton, Colorado location, the company needed to outfit a new lab to house several their new 3D metal printing lab and a place to train staff. For this 3,000 square-foot, tenant improvement project, we provided mechanical, electrical, plumbing systems infrastructure work for the new lab, as well as cosmetic upgrades for 3D’s training and showroom for potential clients of the new venture.

Commercial Tenant Finish
picture of inside of 3d commercial lab
Exterior Image of Rumble Boxing