by Asher Snyder | Jan 3, 2025 |
Light Lounge is a 2,000+ square-foot medical treatment facility specializing in red light therapy administered to alleviate chronic pain and promote body restoration.
Light Lounge is a 2,000+ square-foot medical treatment facility specializing in red light therapy administered to alleviate chronic pain and promote body restoration. This tenant improvement project, located in the newly constructed mixed-use core and shell at 9th and Colorado, marks the fourth Colorado location for the growing Light Lounge franchise, which now boasts ten locations nationwide. The design embraces a minimalist aesthetic with finishes that complement the therapeutic environment, along with integrated 24-hour access control to provide patients with flexible scheduling options.
by Asher Snyder | Jan 2, 2025 |
This 9,920-square-foot remodel for Five Below transformed a core-and-shell space into a fully customized retail location.
The project included structural and architectural updates to the building’s façade, the addition of a new dumpster enclosure, and alterations and improvements to the mechanical, electrical, and plumbing systems. The interior was fitted out to align with the Five Below’s specifications. Five Below is a big-box discount retailer known for on-trend products typically priced at $5 or less.
by Asher Snyder | Dec 30, 2024 |
Rumble Boxing is a 45-minute intense strength and cardio workout set to custom hip-hop and house music with lighting to match the energizing vibe.
Commercial Warehouse / Office Tenant Improvement
A larger than life version of Kong’s signature toy design sits proudly in the new lobby at Kong in Golden, Colorado. The company’s primary line of product is a snowman-like chew toy for dogs. As they continued to grow, they needed to their existing building to make space. We built a new glass entry vestibule, added a second floor, and completed a new storage facility in their warehouse.
“Snyder Building was extremely helpful throughout the project. They focus on proactive communication and a team approach to working through the project. Any challenge that we ran into, they had great solutions.”
Jim Rockwell
Operations, KONG Company
by Asher Snyder | Dec 30, 2024 |
The Micro Center project entailed a full remodel of an existing 29,000 square-foot retail store. Our team developed a phased demolition and renovation plan to complete the project while the retail store was in full operation.
Retail Tenant Improvement / Renovation
The Micro Center project entailed a full remodel of an existing 29,000 square-foot retail store. Our team developed a phased demolition and renovation plan to complete the project while the retail store was in full operation. The interior construction elements included all new ceiling grid, repaired walls and soffits, as well as new lighting, carpet and paint throughout.
by Asher Snyder | Dec 24, 2024 |
Snyder Building Construction completed the 9,207 sqft tenant improvement for the Credit Union of Colorado’s Broomfield location. The project entailed the conversion of an existing bank to the Credit Union of Colorado brand.
Credit Union of Colorado Broomfield, CO
Snyder Building completed the 3,200-square-foot build-out of the gym space, lobby, restrooms, and utility closet for the new location at Orchard Park Place in Westminster, CO. The left side of the gym includes metal I-beam support for the water bags used in the boxing routines and the right side of the gym is outfitted with weight benches and free weights for resistance training.
The client opted for a concealed or hidden structural steel rack for the boxing bags. Sound dampening was a main concern for the adjacent tenants, so a rubber flooring system was installed throughout the space. Acoustical sealant was applied at the top of the walls and an isolation pad was installed at the bottom of the walls to minimize vibrations and sound. The walls were built with a double layer of sheetrock with one being Quiet Rock to provide extra sound protection. An A/V system was installed to provide specialty lighting including black lighting and music throughout.
Snyder Building completed the 3,200-square-foot build-out of the gym space, lobby, restrooms, and utility closet for the new location at Orchard Park Place in Westminster, CO. The left side of the gym includes metal I-beam support for the water bags used in the boxing routines and the right side of the gym is outfitted with weight benches and free weights for resistance training.
The client opted for a concealed or hidden structural steel rack for the boxing bags. Sound dampening was a main concern for the adjacent tenants, so a rubber flooring system was installed throughout the space. Acoustical sealant was applied at the top of the walls and an isolation pad was installed at the bottom of the walls to minimize vibrations and sound. The walls were built with a double layer of sheetrock with one being Quiet Rock to provide extra sound protection. An A/V system was installed to provide specialty lighting including black lighting and music throughout.
“The Credit Union of Colorado selects its contractors based upon best value. Snyder Building Group proved through their quality workmanship, timely delivery of the finished work, and understanding our budget considerations…we are looking forward to working with them on several future projects in our pipeline.”
Darin Rose
Director Administrative Services, Credit Union of Colorado