Credit Union of Colorado

Snyder Building Construction completed the 9,207 sqft tenant improvement for the Credit Union of Colorado’s Broomfield location. The project entailed the conversion of an existing bank to the Credit Union of Colorado brand.

Client

Credit Union of Colorado Broomfield, CO

Project Type

Banking / TI Build-out

Architect

Galloway and Company

About The Project

Snyder Building completed the 3,200-square-foot build-out of the gym space, lobby, restrooms, and utility closet for the new location at Orchard Park Place in Westminster, CO. The left side of the gym includes metal I-beam support for the water bags used in the boxing routines and the right side of the gym is outfitted with weight benches and free weights for resistance training.

The client opted for a concealed or hidden structural steel rack for the boxing bags. Sound dampening was a main concern for the adjacent tenants, so a rubber flooring system was installed throughout the space. Acoustical sealant was applied at the top of the walls and an isolation pad was installed at the bottom of the walls to minimize vibrations and sound. The walls were built with a double layer of sheetrock with one being Quiet Rock to provide extra sound protection. An A/V system was installed to provide specialty lighting including black lighting and music throughout.

living room

About The Project

Snyder Building completed the 3,200-square-foot build-out of the gym space, lobby, restrooms, and utility closet for the new location at Orchard Park Place in Westminster, CO. The left side of the gym includes metal I-beam support for the water bags used in the boxing routines and the right side of the gym is outfitted with weight benches and free weights for resistance training.

The client opted for a concealed or hidden structural steel rack for the boxing bags. Sound dampening was a main concern for the adjacent tenants, so a rubber flooring system was installed throughout the space. Acoustical sealant was applied at the top of the walls and an isolation pad was installed at the bottom of the walls to minimize vibrations and sound. The walls were built with a double layer of sheetrock with one being Quiet Rock to provide extra sound protection. An A/V system was installed to provide specialty lighting including black lighting and music throughout.

image of front loader

“The Credit Union of Colorado selects its contractors based upon best value. Snyder Building Group proved through their quality workmanship, timely delivery of the finished work, and understanding our budget considerations…we are looking forward to working with them on several future projects in our pipeline.”

Darin Rose

Director Administrative Services, Credit Union of Colorado